<?xml version="1.0" encoding="UTF-8"?><rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/"><channel><title>Bedford City - EdTribune OH - Ohio Education Data</title><description>Education data coverage for Bedford City. Data-driven education journalism for Ohio. Every number verified against state DOE data.</description><link>https://oh.edtribune.com/</link><language>en-us</language><copyright>EdTribune 2026</copyright><item><title>Tom Evans Returns to Bedford to Lead Its Move Into New School Buildings</title><link>https://oh.edtribune.com/oh/2026-10-29-oh-bedford-city-evans-superintendent-transition/</link><guid isPermaLink="true">https://oh.edtribune.com/oh/2026-10-29-oh-bedford-city-evans-superintendent-transition/</guid><description>Bedford City Schools is about a year from moving students into new buildings, and its interim superintendent has put the move at the top of his list.</description><pubDate>Thu, 29 Oct 2026 12:00:00 GMT</pubDate><content:encoded>&lt;p&gt;Bedford City Schools is about a year from moving students into new buildings, and its interim superintendent has put the move at the top of his list.&lt;/p&gt;
&lt;p&gt;&quot;First on the list is developing a transition plan for moving into new buildings over the next two years,&quot; Tom Evans wrote in response to questions from The OHEdTribune. &quot;Construction is on schedule and we will be moving into a new K-2 building and new Middle School next year and new High School the year after.&quot;&lt;/p&gt;
&lt;p&gt;Evans is leading &lt;a href=&quot;https://edtribune.com/oh/districts/bedford-city&quot; class=&quot;district-link&quot;&gt;Bedford City&lt;sup&gt;↗&lt;/sup&gt;&lt;/a&gt; for the 2026-27 school year, his second stint in the job. The district&apos;s &lt;a href=&quot;https://www.bedford.k12.oh.us/departments/superintendent&quot;&gt;biography of him&lt;/a&gt; says he first served as interim superintendent in the spring of 2026, through June 30, and returned in September. In between, he wrote, he left for a knee replacement he called long overdue, and he is now back at work. &quot;September 14 was my first day back at work at Bedford,&quot; he wrote.&lt;/p&gt;
&lt;p&gt;&quot;Our students had a very chaotic year last year due to many factors beyond their control, my goal is to bring stability while the board searches for its Superintendent to lead them into the future,&quot; he wrote.&lt;/p&gt;
&lt;h2&gt;Why he came back&lt;/h2&gt;
&lt;p&gt;Asked what brought him back, Evans pointed to the district&apos;s record. &quot;My reason for returning is the tremendous history of excellence this district has and the potential to build off of that history,&quot; he wrote.&lt;/p&gt;
&lt;p&gt;He arrived with a long career in Ohio schools. According to the district biography, he spent more than a decade as superintendent of Cuyahoga Heights Local Schools, after serving there as middle and high school principal, and before that was an assistant principal and program supervisor at the Medina County Career Center. He began as a teacher of agricultural education and horticulture at career centers including Polaris, U.S. Grant and Vanguard, and later taught biology and environmental science at Elyria Catholic High School.&lt;/p&gt;
&lt;p&gt;&quot;I spent the first half of my 46 years in education as a Career Tech Instructor before moving into administration,&quot; Evans wrote. &quot;The hands-on and project based approach to Career Tech can be easily transferred into today&apos;s learners in a comprehensive setting. We must instill critical thinking skills along with creating lifelong learners into today&apos;s students.&quot;&lt;/p&gt;
&lt;h2&gt;The plan he inherits&lt;/h2&gt;
&lt;p&gt;That background meets the building program at the high school. Bedford&apos;s &lt;a href=&quot;https://www.bedford.k12.oh.us/departments/facilities/facilities-plan&quot;&gt;facilities plan&lt;/a&gt;, which grew out of a community committee&apos;s study and a successful bond issue, calls for a new high school with expanded career tech offerings on the current high school site. It also calls for a new middle school for grades six through eight on the Chanel site and a new school for pre-kindergarten through second grade on the Heskett site, with the existing Heskett building reprogrammed for grades three through five. The plan lists Carylwood Intermediate, Central Primary and Glendale Primary for demolition, and names expanding both career tech and pre-kindergarten as goals.&lt;/p&gt;
&lt;p&gt;Those grade groupings are the ones Bedford already uses. The state&apos;s building records show the district reorganized its grades in 2021-22. Before then, its primary schools held kindergarten through third grade, its intermediate schools fourth through sixth, and Heskett Middle School seventh and eighth. Since then, the primaries have held pre-kindergarten through second grade, the intermediates third through fifth, and Heskett sixth through eighth.&lt;/p&gt;
&lt;p&gt;In 2025-26, the most recent school year in the state&apos;s published data, Bedford&apos;s reported male and female headcounts summed to 2,836. The separately published grade rows account for 2,833: 707 in pre-kindergarten through second grade, 604 in grades three through five, 626 in grades six through eight and 896 in grades nine through 12. The difference between the complete sex-category count and the available grade rows is three students; the files do not explain that gap, and no missing grade count is filled in.&lt;/p&gt;
&lt;p&gt;&lt;img src=&quot;https://edtribune.com/oh/img/2026-10-21-oh-bedford-city-evans-superintendent-transition-bands.png&quot; alt=&quot;Bedford&apos;s four grade groups, 2014-15 through 2025-26&quot; /&gt;&lt;/p&gt;
&lt;p&gt;The 2025-26 building records list Central Primary with 382 students and Glendale Primary with 322; both are on the plan&apos;s demolition list. Carylwood Intermediate had 235, Columbus Intermediate 368, Heskett Middle School 606 and Bedford High School 800. Excel Academy, whose published positive grade counts cover eighth through 12th grade, had 123. Each building&apos;s complete male and female counts support its headcount, and together the building counts reconcile to the district&apos;s 2,836.&lt;/p&gt;
&lt;p&gt;&lt;img src=&quot;https://edtribune.com/oh/img/2026-10-21-oh-bedford-city-evans-superintendent-transition-buildings.png&quot; alt=&quot;Bedford&apos;s seven buildings and their grade spans in 2025-26&quot; /&gt;&lt;/p&gt;
&lt;h2&gt;A smaller district, with more preschoolers&lt;/h2&gt;
&lt;p&gt;The October headcount partition counted 3,452 students in 2014-15, 616 more than in 2025-26. The largest single-year drop in that observed series came in 2020-21: 254 students, from 3,168 to 2,914. These comparisons use the same complete male/female partition each year, rather than adding only the grade cells that remain visible.&lt;/p&gt;
&lt;p&gt;&lt;img src=&quot;https://edtribune.com/oh/img/2026-10-21-oh-bedford-city-evans-superintendent-transition-trend.png&quot; alt=&quot;Bedford enrollment by school year, 2014-15 through 2025-26&quot; /&gt;&lt;/p&gt;
&lt;p&gt;The line has not moved in one direction since then. Enrollment reached a low of 2,801 in 2022-23, rose in each of the next two years to 2,899 in 2024-25, and then fell by 63 students in 2025-26.&lt;/p&gt;
&lt;p&gt;Pre-kindergarten has moved the other way. Bedford counted 43 pre-kindergarten students in 2014-15 and 121 in 2025-26, after a high of 137 in 2024-25.&lt;/p&gt;
&lt;p&gt;The high school grades have shrunk too, from 1,058 students in grades nine through 12 in 2014-15 to 896. Since 2021-22, when Excel Academy first appears in the state&apos;s building records, some of those students have been enrolled there rather than at Bedford High School.&lt;/p&gt;
&lt;p&gt;The state&apos;s enrollment files count students on an October date. They do not record why families leave or arrive, and they do not explain the 2020-21 drop. Current-year counts will differ once Ohio publishes its 2026-27 data.&lt;/p&gt;
&lt;h2&gt;Writing the plan before the move&lt;/h2&gt;
&lt;p&gt;By his timeline, the new primary school and middle school open next school year and the high school the year after that. The transition plan he named as his first task is this year&apos;s work, done while the board searches for the full-time superintendent who will lead the district into those buildings.&lt;/p&gt;
&lt;hr /&gt;
&lt;p&gt;&lt;em&gt;Enrollment figures come from the &lt;a href=&quot;https://education.ohio.gov/Topics/Data&quot;&gt;Ohio Department of Education and Workforce&lt;/a&gt;, which publishes district, building and grade enrollment counts by school year. District and building headcounts here add the two fully published male/female categories, checked against each other throughout the series. They are derived complete-partition counts, not independently printed totals. Grade-band counts use the specified published grades; missing grade detail stays missing. No percentage uses a derived total as its denominator. Interim Superintendent Evans answered questions in writing; quotations come from his written replies. Biographical details come from the &lt;a href=&quot;https://www.bedford.k12.oh.us/departments/superintendent&quot;&gt;Bedford City School District&lt;/a&gt;.&lt;/em&gt;&lt;/p&gt;
&lt;p&gt;&lt;em&gt;Detailed code that reproduces the analysis and figures in this article is available exclusively to EdTribune subscribers.&lt;/em&gt;&lt;/p&gt;
</content:encoded></item></channel></rss>